KANSAS TURNPIKE AUTHORITY

 

PROPOSAL FOR

 

ULTRATHIN BONDED ASPHALT OVERLAY

MILEPOST 13.0 TO MILEPOST 27.0

 

KTA CONTRACT NO. 5183

 

 

 

­ADDENDUM NO. 1

 

 

The Contract Documents for KTA Contract No. 5183, Ultrathin Bonded Asphalt Overlay from KTA Milepost 13.0 to KTA Milepost 27.0 are amended in the following particulars only, all other terms and conditions remaining unchanged:

 

SPECIFICATIONS:

 

 

DELETE:       “SPECIAL INSTRUCTIONS & INFORMATION, KTA CONTRACT NO. 5183”, Page 12.

 

ADD:              “SPECIAL INSTRUCTIONS & INFORMATION, KTA CONTRACT NO. 5183, REVISED”, Rev. 11/09, enclosed herewith.

 

DELETE:         “SCHEDULE OF PRICES”, Page 49.

 

ADD:               “SCHEDULE OF PRICES – REVISED”, Rev. 11/09, enclosed herewith.

 

 

This Addendum is hereby made part of the Contract Documents to the same extent as if contained in the original Contract Documents.

 

Each bidder shall acknowledge receipt of this Addendum in the space provided below and shall include this Addendum as part of the Proposal.

 

ADDENDUM NO. ­  1  ­ RECEIVED BY:

 

 

___________________________________

Authorized Signature / Title

 

 

___________________________________

                                                                        Company Name

 

11/30/09

KANSAS TURNPIKE AUTHORITY

SPECIAL PROVISION

TO THE

STANDARD SPECIFICATIONS

EDITION OF 2007

 

 

SPECIAL INSTRUCTIONS & INFORMATION

KTA CONTRACT NO. 5183

 

 

NOTE:    Whenever this Special Provision conflicts with the Plans, Supplemental Specifications, or Standard Specifications, this Special Provision shall govern.

 

1.0       DESCRIPTION:

The work under this contract will include 5/8 inch ultrathin bonded asphalt overlay from Milepost 13.0 to 27.0.

 

There shall be no profilograph requirement on this project.

 

The milled material shall remain the property of the KTA.

 

 

2.0       TRAFFIC CONTROL:

Each operation of work, roadway planing, asphalt, and pavement markings, shall have its own separate traffic control.  This means each operation will have separate arrow boards, signs, and barrels.

 

The Contractor will be allowed no more than five (5) miles of construction zone requiring a lane closure in any one direction of travel.  In no case shall a lane be closed in one direction for more than five (5) miles.

 

If the Contractor has no activity in a work zone for a period exceeding one (1) day, the Engineer may require removal of non-essential traffic control devices in the interest of keeping as much of the roadway open as possible.

 

 

 

 

 

 

 

 

 

 

 

Rev. 11/30/09

 

 

 

KTA Contract #5183

Page 12 of 49

Addendum No. 1


Kansas Turnpike Authority                          Page 1 of  1            

 

Schedule of Prices

Contract No.    5183   

 

County Sumner County

 

Type of Work:             Ultrathin Bonded Asphalt Overlay - Milepost 13.0 to Milepost 27.0                           

 

The bidder shall extend all items and total the bid.

 

 

Bidding Item

 

Approximate Quantity

 

 

Unit

 

 

Unit Price

 

 

Amount

 

 

 

 

 

Mobilization

LUMP SUM

LS

 

 

Roadway Planing (5/8”)

43,000

SQYD

 

 

HMA Surface (Ultrathin Bonded)(Type B)(PG 70-28)

15,400

TONS

 

 

Emulsified Asphalt (Emulsified Bonding Liquid)

400

TONS

 

 

Shoulder Seal

300,000

SQYD

 

 

Traffic Control

LUMP SUM

LS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Grand Total:

$

 

 

 

Dollars

 

 

Signed:                                                                                   

 

 

Company Name:                                                                    

Rev. 11/30/09

 

 

KTA Contract #5183

Page 49 of 49

Addendum No. 1